Florida.Simms.com

Choose Your Lifestyle

Categories

Translator

Archives

Teardown Chronicle – Day 50 (72) – Interior Work

Interior Wallboard going up

The new waterfront home in St Petersburg (you can see the boat when you look through the house) is now starting to have the interior work done. The interior studs have been installed and now you can see the wallboard installed in this portion of the ground level. Although this ground level is not “living space”, a small foyer is allowed to be finished and air conditioned. The remainder of the ground level is garage and storage space.

Print Friendly

Leave a Reply

Add to Technorati Favorites Directory of Real Estate Blogs Real Estate Blogs - Blog Top Sites

Copyright © 2007 Florida Simms     Agent Login     Design by Real Estate Tomato     Powered by Tomato Blogs