Teardown Chronicle – Day 50 (72) – Interior Work
September 10th, 2008 categories: Teardown Chronicle
The new waterfront home in St Petersburg (you can see the boat when you look through the house) is now starting to have the interior work done. The interior studs have been installed and now you can see the wallboard installed in this portion of the ground level. Although this ground level is not “living space”, a small foyer is allowed to be finished and air conditioned. The remainder of the ground level is garage and storage space.
Discussion: No Comments »
|